Acting for the energy transition

Project: Acquisition Of Photovoltaic Plants

Sector: Photovoltaic / Location: Italy

THE CONTEXT

THE PROJECT COVERS THE ACQUISITION OF 4 PHOTOVOLTAIC GROUND POWER PLANTS WITH A PRODUCTION OF MORE THAN 8.6 MW OF SOLAR ENERGY, LOCATED IN THE REGIONS OF PUGLIA (CENTRALE BARLETTA), PIEMONT (CENTRALE CARMAGNOLA), BASILICATA (CENTRALE PESCOPAGANO) AND TERAMO.

PRODUCTION

8,6

MW

CENTRAL BARLETTA

Location: South East
Plant type: Ground
Installed power: 993 kWh
Land area: 25 Ha
Irradiation: 1400 kWh / kWp
Annual production: 1,390,200 kWh / year
Commissioning: 30/04/2011
Inverter: 2 x 500 kWp / Ingecon® Sun 500 TL
Panels: Crystalline PV Module / CHSM 5612M (BL) Series

puglia-barletta-picture
piemonte-carmagnola-picture

CENTRAL CARMAGNOLA

Plant type: Ground
Installed power: 847 kWh
Land area: 4,5 Ha
Irradiation: 1000 kWh / kWp
Annual production: 847 000 kWh / year
Commissioning: 08/2011
Inverter: 2 x 375 kWp / Ingecon® Sun 375 TL
Panels: Würth Solar / GeneCIS solar module 80W

CENTRALE PESCOPAGANO

Plant type: Ground
Installed power: 957 kWh
Land area: 4,5 Ha
Irradiation: 1300 kWh / kWp
Annual production: 1,244,100 kWh / year
Commissioning: 06/2011
Inverters: 2 x 500 kWp / ULTRA-1400.0-TL
Panels: Solarfun / SF 220-30-P

basilicata-pescopagano-picture-2
20180724_084108

CENTRALE TERAMO

Plant type: Ground
Installed power: 5,829 kWp
Irradiation: 1200 kWh / kWp
Annual production: 6,994,944 kWh / year
Commissioning: 2011